Big Shine SingaporeSweeping light curves beside the Big Shine Singapore wordmark.BIGSHINESINGAPORE
WhatsApp us
Project story / Event rental

DBS Chromo: four logo projectors around Marina Bay

For one evening, Big Shine rented, assessed sites for and set up four logo projectors across three Marina Bay locations.

Event rental with site assessment, on-site setup and operator handover for DBS Chromo on 17 September 2026.

Updated 2026-08-132 min read
“DBS Chromo” projected onto the canopy fascia above a lit fountain pool at night
DBS Chromo projected across the fountain pool at Marina Barrage.

Brief

DBS Chromo needed its event mark projected at three outdoor waterfront sites around Marina Bay for one evening, 17 September 2026: Marina Barrage, the underside of Benjamin Sheares Bridge, and the waterfront outside Marina Bay Sands, which took two units. Four logo projectors were rented for the night.

Three sites around the bay1. Marina Barrage: 1 unit, projecting onto the canopy across the fountain pool. 2. Benjamin Sheares Bridge: 1 unit, under the bridge on the Marina Centre side. 3. Outside Marina Bay Sands: 2 units, floor projections on the waterfront facing the CBD skyline.Marina BayMarina Channel1Marina Barrage2Benjamin Sheares Bridge3Outside Marina Bay SandsN0200M
  1. Marina Barrage1 unit, projecting onto the canopy across the fountain pool.
  2. Benjamin Sheares Bridge1 unit, under the bridge on the Marina Centre side.
  3. Outside Marina Bay Sands2 units, floor projections on the waterfront facing the CBD skyline.
Pin positions are approximate. Drawn from © OpenStreetMap contributors.

Site assessment

Before the event, the Big Shine team visited each location to choose the projection surface and image size, and to check that each unit would be bright enough against the ambient light already on site: architectural uplighting, LED installations and city light from the skyline. The surfaces differed a lot: a concrete soffit seen from below, a building fascia across a fountain pool, and open paving along the waterfront. Each one needed its own placement and image size.

Setup and handover

On the event day the team set up all four units, aligned and focused each projection on its surface, and then showed the event operators how to run the projectors themselves for the rest of the evening.

Site clip from Marina Barrage: riders pass the floor projection (muted).

What this shows

The photos and clip confirm visible logo projections at the event sites on the night. We have not measured attendance or visitor response, so this page describes the rental and setup, not marketing results. Customer, logo, venue, photo and video reuse for this project was cleared on 2026-10-05.

Photo-first survey

Plan an event projection

Include the date, venues, surfaces, and whether you need setup and operator handover.

Plan an event projection